Explore Other Data Centres:

Santa Clara Data Centres

Commitment to Compliance

Cyxtera is dedicated to continuously improving and maintaining compliance and standards that are critical to customers.

Exponential Technology Advancement

Four of the footprint of 60+ Cyxtera global data centres are situated in Santa Clara, a vibrant technology hub near San Francisco.

The semiconductor chip has created almost 20x growth in this region over the past few decades. The Santa Clara data centres supply the space, network, and security that enable such growth and global reach.

Offering more than 45,151 m² of combined colocation space, the four cutting-edge Santa Clara data centres meet ISO certifications and are Zone IV seismic compliant. Data within each colocation centre is protected by rigorous fire detection and suppression methods, as well as multi-level physical and biometric security measures. Cyxtera offers an ecosystem of service provider via cross-connects for easy access to network, hosting, and storage services, keeping data moving and powering innovation.

Announcements

Take a Virtual Tour of the OC2 Data Centre

Data Centres

Santa Clara Data Centre Locations

Locations

SC4: Santa Clara, CA

Space: 15,601 m²   Power: 8 MW

Tech Specs

SC4: Santa Clara     Space: 15,601 m²     Power: 8 MW

Real Estate Summary

  • Located near San Jose and San Francisco International Airports; 10 minutes from San Jose, 35 minutes from San Francisco, CA
  • Two story building
  • Total building interior (sf) = 167,932
  • Raised floor (inches) = 12

Electrical Summary

  • Santa Clara provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 8 MW
  • Minimum two fuel replenishing company

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilises two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N +1
  • Temperature and humidity managed to strict ASHRAE standard

SC5: Santa Clara, CA

Space: 9,656 m²   Power: 8 MW

Tech Specs

SC5: Santa Clara     Space: 9,656 m²     Power: 8 MW

Real Estate Summary

  • Located near San Jose and San Francisco International Airports; 10 minutes from San Jose, 35 minutes from San Francisco, CA
  • One story building
  • Total building interior (sf) = 103,940
  • Raised floor (inches) = 18

Electrical Summary

  • Santa Clara provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 8 MW
  • Minimum one fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilises two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N + 1
  • Temperature and humidity managed to strict ASHRAE standard

SC8: Santa Clara, CA

Space: 8,374 m²   Power: 10 MW

Tech Specs

SC8: Santa Clara     Space: 8,374 m²     Power: 10 MW

Real Estate Summary

  • Located near San Jose Airport; 10 minutes from San Jose, CA
  • One story building
  • Total building interior (sf) = 90,139
  • Raised floor (inches) = 30 

Electrical Summary

  • Santa Clara provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 10 MW
  • Minimum one fuel replenishing companies 

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilises two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N + 1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard 

SC9: Santa Clara, CA 

Space: 11,556 m²   Power: 10 MW

Tech Specs

SC9: Santa Clara     Space: 11,556 m²     Power: 10 MW

Real Estate Summary

  • Located near San Jose Airport; 10 minutes from San Jose, CA
  • One story building
  • Total building interior (sf) = 124,383
  • Raised floor (inches) = 36 

Electrical Summary

  • Santa Clara provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 10 MW
  • Minimum one fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilises two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N + 1
  • Temperature and humidity managed to strict ASHRAE standard

More Locations 

Over 60 Data Centre Locations Worldwide

Latest from the EpiCenter Blog

Innovations in Data Centre Connectivity

Michael Levy | April 18,2017

Many businesses must avail themselves of the latest technology to remain competitive in their industry. For instance, many car manufacturers now include backup cameras, Bluetooth and GPS capabilities and in-car Wi-Fi in their newer models. Newer vehicles without those technologies … Read more…→ The post Innovations in Data Centre Connectivity appeared first on CenturyLink EpiCenter Blog.

Business Continuity Planning: The Distributed Data Centre Approach (Part Two)

Chip Freund | April 05,2017

As I discussed in my most recent blog, some companies utilise a distributed data centre approach to achieve redundancy, scalability and high availability as part of their plan for business continuity. It enables businesses to help mitigate disasters that can … Read more…→ The post Business Continuity Planning: The Distributed Data Centre Approach (Part Two) appeared first on CenturyLink EpiCenter Blog.

Data Centre World Global - Unleashing the Power of Colocation

David Murphy | April 03,2017

The greatest ideas - the most impactful innovations - come from recognising an opportunity and then trying new approaches. As I look forward to the Data Centre World Global meeting to be held in Los Angeles, I think about what … Read more…→ The post Data Centre World Global - Unleashing the Power of Colocation appeared first on CenturyLink EpiCenter Blog.

CenturyLink
Business
@CenturyLink ENT

Resources

Get Started with Featured Resources and Tools

Get Started
Call Us

Call Us

SALES: +61 2 9006 1101
SUPPORT: 1800 097 572

Get Connected. See What's Next for Business.
CenturyLink has sold its data centres and associated colocation business to a consortium led by BC Partners and Medina Capital Advisors. This move led to the creation of a bold, new company, Cyxtera Technologies, comprised of world-class talent and technology. CenturyLink will continue to work closely with Cyxtera and the same strong team that has operated the data centres successfully for years and who will continue to deliver world-class customer service and Operational Excellence for all colocation customers.